For this project we had to find a building to project on. I chose the side of the entryway of the King Center on the Auraria Campus. It was a rather chalenging place to project on with the gap in the center. I planned out my project after doing some test projections to run along the bottom, up the side and across the top.
I ran into difficulties in saving the file. I just had to choose some options and everything was fixed.


Here is a link to the video projection: http://vimeo.com/11610712
Advertisement

